Lake Wind Power (716)-201-1091

6805 Mulburry Lane Ste A, Lockport NY 14094

FAIL (the browser should render some flash content, not this).

How Do I Get One?

How Do I Get One?

Lake Wind Power is an authorized dealer/installer of the Swift Wind Turbine in New York State.

If you wish to purchase a Swift Wind Turbine and would like to know what it might cost, email us at info@lakewindpower.com or call us at 716.201.1091 and we will prepare a price quotation for you.

A wind turbine installation typically has four cost components: the wind turbine, the method of mounting (structure or pole), engineering of the mounting method and the physical installation. Each installation requires the services of a licensed professional engineer, a licensed master electrician, and installers trained and certified by the wind turbine manufacturer.

Our team of installers have been trained and certified by Swift Wind Turbine at their factory in Grand Rapids, MI. Ted VanDeusen is our lead installer.  He has thirty plus years in high-end residential and commercial  construction and project management. Professional engineering services are provided by John Battaglia, P.E., M.B.A. and his firm ENSOL, Inc. His staff of professional engineers hold engineering licenses in six states including New York.